14th Avenue Housing project 2

Century Property Developments originated in 1975, primarily as a developer of shopping centres, and has since diversified into exclusive residential estates and commercial developments. Century Property Developments is one of the largest Medium to High Income Housing Developer in Southern Africa. https://century.co.za/ The Project comprises of 29 Buildings each with 40 apartments. Current Hot water delivery is via a ‘Tankless – Gas – Ring Main’ on each building. Hot water is meter at the flat unit and sold to the tenant or home owner. We have been asked to install Solar systems onto the ring mains of the 29 buildings. Phase 1 of the project will be 15 buildings The core purpose of the Solar System is to save ring main losses.
 

In one year, this installation gives a solar yield of 379.13 MWh and is responsible for the avoidance of 131128.70 kilograms of CO2 emissions.

Country
South Africa
Nearest place
Randburg
Installation
Primary service
Hot Water
System count
16

General info

Circulation
Pumped
Heat exchange
Indirect

Collectors

Collector type
Flat plate
Collector area
531.00 m2
Collector power
371.70 kWth
Collector tilt
40°
Supplier
Viessmann

Storage

Capacity
24000 litres
Backup
Gas
Supplier
Thermocube, manufactured by Sirac, EPDM, SA
14th Avenue Housing project 2
loading ...