Epukiro Post3 Secondary School

Epukiro, Namibia

Installation date
Primary energy-service
Hot Water
Number of systems
20
Circulation-type
Thermosyphon
Heat exchange
Indirect
Collector/s
Collector type
EVACUATED_TUBE
Collector area
97.60 m2
Collector power
68.30 kWth
Collector tilt
25°
Collector supplier
Jiangsu GMO China
Storage
Capacity
6000 litres
Backup
Electrical2
Supplier
Jiangsu GMO China
About

The school is located within Omawewozonyanda, which is a suburb within Epukiro Post 3 in the Omaheke region in Namibia. This school holds marginalised and previously disadvantaged communities such as those from the Ovahimba Community, and the majority of the students are from that community.
 

In one year, this installation gives a solar yield of 87.90 MWh and is responsible for the avoidance of 30414.40 kilograms of CO2 emissions.
Epukiro Post3 Secondary School
loading ...