Hostel São Pedro Julião

Maputo, Mozambique

Installation date
March, 2019
Primary energy-service
Hot Water
Number of systems
4
Circulation-type
Thermosyphon
Heat exchange
Indirect
Collector/s
Collector type
FLAT_PLATE
Collector area
15.50 m2
Collector power
10.70 kWth
Collector tilt
25°
Collector supplier
GREENoneTEC, Austria
Storage
Capacity
1200 litres
Backup
Electrical2
Supplier
GREENoneTEC, Austria
About

The hostel was launched in 1991. It currently hosts 22 people (17 beds for seminaries, 1 priest and 4 employees).

In one year, this installation gives a solar yield of 13.20 MWh and is responsible for the avoidance of 4551.00 kilograms of CO2 emissions.
Hostel São Pedro Julião
loading ...